Comprehensive Quality Control Report for Finger-Jointed Pine Primed-Coated Wood MoldingPrepared by: PeterDate: Feb 19th,2025 1. …
Read More »Third-Party Quality Inspection Report for Engineered Wood Multi-Layer Flooring Client U.S. Importer (Name withheld for confidentiality) Supplier Factory Hanoi, Vietnam Inspection Date: February 6, 2025 Inspected Quantity Two (2) containers of flooring
Third-Party Quality Inspection Report for Engineered Wood Multi-Layer FlooringClient: U.S. Importer (Name withheld for confidentiality)Supplier Factory: Hanoi, VietnamInspection Date: February 6, 2025Inspected Quantity: Two (2) containers of flooring 1. Executive Summary On February 6, 2025, our quality control (QC) team, alongside the U.S. client’s purchasing manager, conducted an on-site inspection of engineered wood multi-layer flooring at the supplier’s facility in …
Read More »